Guides

Christmas Lighting Terminology: 90 Installer Terms, Priced

90 installer terms for Christmas and permanent lighting, from roofline and jump to track, node and escalator, each with where it lands on a quote and a price.

  • 15 minread time
  • 6tables
  • 5sources checked
  • 6questions answered
On this page10 sections
  1. Measuring terms: what am I drawing?
  2. Product terms: what am I hanging?
  3. Pricing terms: how does the number get built?
  4. Agreement terms: what is the customer signing?
  5. Crew terms: what happens on the day?
  6. Worked example: one quote, read with the terms
  7. Terms that get mixed up
  8. Where the vocabulary lives in the software
  9. Questions installers ask
  10. Sources

Christmas lighting terminology for installers comes down to 90 terms, and this page defines each one in plain words and shows where it lands on a quote, with GlowBid's default rate card beside the pricing terms: $8 per foot of C9 roofline, $25 for track, 15 percent on peaks, a $1,500 minimum job. Installers set their own numbers. The terms are grouped the way a job runs: measuring, products, pricing, agreements, crew.

I run a permanent lighting company in Ottawa and built GlowBid. LightMaster's Holiday Lighting 101 is the page that ranks for this today; it defines four bulb types for homeowners, carries no prices, no author and no date, and never uses the words an installer uses on a ladder. This page is the vocabulary the crew, the quote and the software share. Every default price is GlowBid's and is labelled; every outside rule is linked. Photo measurements are estimates confirmed on site, and the measuring terms say so.

Measuring terms: what am I drawing?#

The run types, the parts of the roof they sit on, and the words the canvas uses for how sure it is. On a quote these show up as footage by run.

Term Plain definition Where it shows up in a quote
Roofline The eave edge of the roof, where the gutter and fascia run. The main lit run on most houses, and ladder work Footage by run: "Roofline 120 ft", priced per foot ($8 C9, $25 track, GlowBid default)
Fascia The vertical board behind the gutter. Track screws into it; gutter clips hook in front of it Scope block: "track mounted to fascia"
Soffit The underside of the eave. Some permanent systems mount here instead of the fascia Scope block, mounting note
Ridge line The top edge where two roof planes meet. Roof work: you walk to it Footage by run: "Ridge line 40 ft", same base rate as roofline on the default card
Peak The triangle of a gable end, run from the eave up to the point and back down Footage by run: "Peaks 30 ft" at $9 (C9) or $28 (track), plus the peak premium
Hip A sloped outside edge where two roof planes meet. Lit like a ridge line Ridge line footage
Dormer A small roofed window box sticking out of the roof. Adds two short peaks and a jump Extra peak footage and a jump
Return The short horizontal bit where a roofline turns a corner or wraps a gable end A few feet added to the roofline line
Jump An unlit stretch of cord between two lit runs, across a valley, a dormer or a gap Footage by run: "Jumps 8 ft" at $4 (C9) or $12 (track)
Run One drawn line of lights of one type. A quote is a list of runs Every footage line is one run
Lit feet Feet with bulbs or nodes on them. Jumps are run feet, not lit feet Total lit feet on the summary
Ground run Lights along a walkway, garden bed or fence at ground level "Ground 30 ft" at $5 (C9)
Tree wrap Lights wrapped around a trunk and branches, priced per foot of wrap "Tree 40 ft" at $6 (C9)
Storey Each floor above the first adds ladder height and time Storey premium, 10 percent per storey above the first (default)
Pitch How steep the roof is. Steep pitch means rope work on peaks and ridges The peak premium, 15 percent (default)
Reference length A known dimension in the photo, a 16 ft garage door or a tape measurement, used to set the scale Measurement note: "scaled from the garage door"
Foreshortening A run angled away from the camera looks shorter than it is A warning flag on that run
Source tag Where each measurement came from: reference-scaled or manual Beside each footage line
Confidence level How much to trust the measurement, from the scale quality and the camera angle Beside the source tag
Measurement disclaimer The line that photo measurements are estimates confirmed on site Every quote, next to the scope

The photo measuring guide walks through the reference length and the foreshortening flag, and the ridge, peak and jump pricing page shows why those three run types get their own rates.

Interactive

The six runs you draw

Hover or tab through the legend. Each run has its own rate because each one costs a different amount of ladder time per foot.

Pick a run to see what it is and how installers usually price it.

Product terms: what am I hanging?#

Seasonal product first, then the permanent parts. On a quote these are the product line, the add-ons and the bill of materials.

Term Plain definition Where it shows up in a quote
C9 The big teardrop bulb on 12 inch spacing, the roofline standard for seasonal work Product line: C9 seasonal
Mini lights Small bulbs on thin wire, for trees, wreaths and wraps Tree wrap line and add-ons
Socket cord Bulk cord with an empty socket every 12 inches. You cut it to the house Bill of materials: cord feet
SPT-1 and SPT-2 Zip cord gauges. SPT-2 has thicker insulation; both take vampire plugs Bill of materials: cord
Vampire plug A plug that bites into cut zip cord, so any cut length becomes a run Bill of materials: one per run
Bulb spacing Distance between bulbs or nodes. 12 inch for C9; permanent lines run 6 to 16 inch The product line name, and the node count
Clips Shingle tab, gutter, ridge and all-in-one clips that hold cord to the roof edge Bill of materials: clips per foot
Track (channel) An aluminum extrusion screwed to the fascia that hides the wiring and holds permanent nodes Product line: track, $25 per foot of roofline (default)
No-track A permanent line mounted with adhesive or clips, no channel. Cheaper; adhesive stops bonding in the cold Product line: no-track, $20 per foot (default)
Node One LED point in a permanent run Node count on the bill of materials
Controller The box that runs the show: colours, patterns, schedule, phone app Add-on: Wi-Fi controller, $250 (default)
Low voltage 12, 24 or 48 volt permanent systems fed by a transformer or power supply from a 120 volt outlet Scope block, and a power supply add-on
RGB and RGBW Colour-changing nodes; the W adds a true white diode Product line name
Warm white The amber-white most homeowners ask for on a roofline Colour choice on the quote
Certification mark CSA, cUL or ETL mark showing the product meets Canadian rules; Ontario's ESA asks for it on outdoor lights Product spec line
GFCI A ground-fault outlet or adapter for outdoor circuits Scope block, or a small add-on
Timer A plug-in or smart timer for seasonal lines Add-on: timer, $45 (default)
Decorations Wreaths, garland, snowfall tubes, icicle and net lights, priced each or on a custom line Add-on lines
Kit A fixed bundle at a fixed price, "front roofline up to 150 ft" A kit line instead of per-foot lines
Product line A price list for one product family: track, no-track, C9 seasonal, seasonal service, or one you add The heading each run is priced under
Materials buffer Extra product ordered over the drawn footage. 10 percent by default, the installer's choice On the bill of materials, never on the price

Pricing terms: how does the number get built?#

In the order the engine applies them: runs and premiums, add-ons, discount, minimum job, tax, deposit. The per-foot pricing guide works a full house through the same order.

Term Plain definition Where it shows up in a quote
Price per foot The base rate for one lit foot of a run type on a product line Every run line
Rate card Your whole price list: per-foot rates, premiums, add-ons, minimum job, deposit, tax Behind every number on the quote
Run type Roofline, ridge line, peak, ground, tree, jump, or one you add. Each has its own rate Footage by run
Peak premium A percent added to peak runs for the rope work. 15 percent (default) Premium line
Storey premium A percent per storey above the first. 10 percent (default) Premium line
Rush premium A percent for a job squeezed in late. 20 percent (default) Premium line
Per-jump charge A flat amount per jump on top of the per-foot rate. $0 (default) Premium line
Per-peak charge A flat amount per peak on top of the per-foot rate. $0 (default) Premium line
Add-on Anything priced each: controller, timer, wreath, power supply Add-on lines
Discount A percent or flat amount off, applied before the minimum check Discount line
Minimum job The smallest ticket you will roll a truck for. $1,500 (default) "Minimum job adjustment" line when the subtotal is under it
Subtotal Runs plus premiums plus add-ons, less discount, after the minimum check Subtotal line
Tax line GST or HST on the subtotal; 13 percent HST in Ontario, 0 by default until you set it Tax line
Deposit A percent of the taxed total collected at signature. 30 percent (default) Deposit due line
Bill of materials Cord, bulbs, clips, plugs, nodes and track, counted from the drawing The sheet behind the quote, not on it
Takedown Taking seasonal lights down after the holidays. Inside the C9 per-foot rate on the default card; a separate visit on customer-owned lights Scope block ("takedown included") or a line on the seasonal service card
Re-install Hanging customer-owned lights again next season Seasonal service line, $3 per foot of roofline (default)
Service call A visit to fix a dead section or a controller Service line
Seasonal service The product line for install, takedown and re-install on lights the customer owns Its own rate card line

Agreement terms: what is the customer signing?#

The three agreement types, the lease vocabulary and the clauses. The multi-year lease template shows them in place.

Term Plain definition Where it shows up in a quote
Estimate, quote, proposal An estimate is a price from a photo; a quote is a firm price to sign; a proposal is the quote with the mockup, scope and terms attached The document title
Scope block The paragraph saying what is included, mounted where, what is not, and the insurance line Above the signature
Agreement type Permanent one-time, seasonal service on customer-owned lights, or a multi-year seasonal lease Agreement header
Lease term 1, 3 or 5 seasons on a lease Term line
Price schedule How each season is priced: flat, declining rent-to-own, or escalator percent Season-by-season table
Escalator A percent rise each season on the schedule Schedule line
Rent-to-own A declining schedule that ends with the customer owning the lights Schedule and disposition
Includes-flags What the lease covers: product, maintenance, takedown, storage Checkboxes on the agreement
End-of-term disposition What happens to the lights at the end: buyout, return or renew Final clause
Asset record Your file on a leased customer's strands: count, storage bin, condition, buyout value Not on the quote; in the customer file
Storage liability cap The most you owe if stored lights are lost; $500 or equivalent product in the sample wording Storage clause
Roof damage waiver The clause that caps what you owe for a cracked shingle and excludes brittle materials; $500 per incident in the sample wording Waiver clause
Weather clause Force majeure: ice and wind move the date, not the price Weather clause
Cancellation tiers What is refunded if the customer cancels, by how close to install day Cancellation clause
E-signature The customer signs on their phone Signature block
Document fingerprint A SHA-256 hash of the signed document, so nobody can argue the text changed Under the signature
Certificate of insurance The one-page proof of your liability policy Attached to the proposal
Completed operations The part of a liability policy that covers your work after you leave the site Not on the quote; in the policy
CASL consent A Canadian customer's permission to be texted or emailed under Canada's anti-spam law The consent line on the quote form

Sample clause wording ships with a plain notice that it is not legal advice; installers edit their own clauses and a local lawyer reads them.

Crew terms: what happens on the day?#

The job side, most of it never seen by the customer. On Ultimate the crew sees the work order and never the prices.

Term Plain definition Where it shows up in a quote
Install The day the lights go up Job date on the agreement
Takedown window The dates the lights come down; January 2 to February 28 in the sample lease wording Takedown clause
Work order The crew's version of the job: runs, footage, product, photos, no prices Crew side only
Production board The job stages: Signed, Booked, In Progress, Finished Not on the quote
Photo-gated checklist A checklist step that will not close without a photo Crew side only
Homeowner sign-off The customer confirms the finished job on the crew's phone Closes the job
Ladder set One placement of the ladder. A 140 ft roofline is 12 to 16 sets with a 28 ft extension Behind the labour estimate
Ladder rules CCOHS: 1 foot out for every 4 up, 1 m above the eave, three points of contact, a standoff on the fascia Crew checklist
Working at heights card Ontario's approved training, valid 3 years, for roof walkers Crew file
Crew role An app login that sees the work order but never prices or customer contact details Ultimate only
Re-book Asking last season's customer to sign again, usually in August CRM stage: the pipeline has Takedown and Re-book columns

Worked example: one quote, read with the terms#

A bungalow, C9 seasonal, on GlowBid's default card. Four runs drawn on the installer's own photo, scaled from a 16 ft garage door, plus a timer.

Line (the term) Footage and rate Amount
Roofline (run type) 120 ft at $8 (price per foot) $960.00
Peaks (run type), two gables 30 ft at $9, plus the 15% peak premium ($40.50) $310.50
Jumps (run type), two of 4 ft 8 ft at $4; per-jump charge $0 $32.00
Ground run (run type), walkway 30 ft at $5 $150.00
Timer (add-on) 1 at $45 $45.00
Before the minimum check $1,497.50
Minimum job adjustment $1,500 minimum, $2.50 short $2.50
Subtotal $1,500.00
Tax line 0 by default; 13% HST in Ontario would add $195.00 $0.00
Deposit (30% of the taxed total) Collected at e-signature $450.00

The bill of materials behind it: 180 lit feet of C9 bulbs on 188 ft of socket cord (the jumps are cord with no bulbs), 198 bulbs and about 207 ft of cord with the 10 percent materials buffer, clips for 150 ft of roof edge, four vampire plugs, one timer. The scope block carries the insurance line and the measurement disclaimer, the customer signs on their phone, and the SHA-256 fingerprint sits under the signature. You can draw this bungalow in the free roofline tool and see the 180 lit feet before a rate is typed.

Terms that get mixed up#

  • Roofline and ridge line. One is the eave, one is the top. Different ladder, different risk, and on many rate cards a different rate. Draw them as different run types.
  • Lit feet and run feet. A jump is run feet. Price it as a jump, not as roofline, or you are charging $8 for cord with no bulbs.
  • Peak premium and per-peak charge. The premium is a percent on the peak footage; the charge is a flat amount per peak. The default card uses the percent and leaves the charge at $0. Use one or both, but know which.
  • Minimum job and deposit. The minimum is a floor on the subtotal; the deposit is a percent of the taxed total. A $1,497.50 job becomes $1,500, and the deposit is 30 percent of that plus tax.
  • Estimate and quote. A photo estimate carries the disclaimer; the quote the customer signs still does, because the footage is confirmed on site.
  • Takedown and re-install. Two visits, two prices, two dates. A lease creates both jobs per season; a one-time permanent job has neither.
  • Track and no-track. Same nodes, different mount, different per-foot rate, and a different cold-weather cutoff for the adhesive.
  • Controller and timer. A timer switches a seasonal line on and off; a controller runs a permanent line's colours and patterns from an app. Both are add-ons; they are not the same line.

Where the vocabulary lives in the software#

On one canvas. In GlowBid you draw the runs by type on a photo you own, set the scale from a reference length, and the footage, the bill of materials and the price all come from the same lines; every measurement carries its source tag and confidence level, and every quote carries the disclaimer. The rate card holds the pricing terms, the agreement holds the clause terms, and on Ultimate the work order holds the crew terms with no prices on it. Core is $299 a year at the founding price, with a 7-day trial and no card, and the free roofline tool draws the house with no login until you export.

FAQ

Questions installers ask

What is a jump in permanent lighting?

An unlit stretch of cord or wire that carries power between two lit runs: across a valley, around a dormer, over a gap between the garage and the house. It is run feet but not lit feet, so it gets its own run type and a lower rate. GlowBid's default card prices a jump at $12 per foot on the track line, $10 on no-track and $4 on C9 seasonal, with an optional flat per-jump charge on top.

What is the difference between a roofline, a ridge line and a peak?

Where the run sits on the roof. The roofline is the eave edge, where the gutter and fascia are, and it is ladder work. The ridge line is the top edge where two roof planes meet, and it is roof work. A peak is the triangle of a gable, run from the eave up to the point and back. Each is its own run type with its own per-foot rate, and peaks carry a premium for the rope work.

What are track, channel and node in permanent lighting?

Track and channel are the same thing: an aluminum extrusion screwed to the fascia that hides the wiring and holds the lights. A node is one LED point along the run, spaced 6 to 16 inches apart depending on the brand and line. A no-track line mounts the nodes with adhesive or clips and skips the channel. On GlowBid's default card track roofline is $25 per foot and no-track is $20.

What does price per foot mean on a Christmas light quote?

The base rate for one lit foot of one run type on one product line, before premiums and add-ons. A quote lists footage by run, multiplies each by its rate, adds the peak, storey and rush premiums, adds the add-ons such as a controller or timer, applies any discount, checks the minimum job, then adds tax and takes the deposit from the taxed total. Installers set their own rates on the rate card.

What is takedown, and why not call it something else?

Takedown is the trade word for taking seasonal lights down after the holidays, usually in January. On GlowBid's default C9 line it is inside the $8 per foot and the scope block says so; on customer-owned lights it is a visit on the seasonal service line. It is its own job because it has its own date, weather risk and ladder time, and a signed lease creates each season's install job and takedown job at once.

What is a lease escalator in a multi-year lighting agreement?

A percent the season price rises by each year on a multi-year seasonal lease, one of three price schedules alongside flat and declining rent-to-own. A 3 percent escalator on a $1,865.20 season makes year two $1,921.16 and year three $1,978.79, the schedule in our lease template. The schedule is printed season by season on the agreement so the customer signs the whole term once, and the sample clause wording ships with a plain notice that it is not legal advice.

Sources

5 pages checked for this article

  1. LightMaster, Holiday Lighting 101: the homeowner and installer guide (undated, no author, no prices), accessed September 8, 2026lightmaster.io
  2. CCOHS, OSH Answers, Ladders - Portable (1 foot out for every 4 feet up; three-point contact; extend 1 m above the landing), accessed September 7, 2026ccohs.ca
  3. Government of Ontario, Training for working at heights (approved program, valid 3 years), accessed September 8, 2026ontario.ca
  4. Electrical Safety Authority (Ontario), Holiday Safety (outdoor-rated lights, GFCI outdoors, Canadian certification mark), accessed September 7, 2026esasafe.com
  5. Government of Canada, Canada's anti-spam legislation (CASL) overview, accessed September 7, 2026ised-isde.canada.ca